Nuisance.ie Planning
The Planning Condition Proof Box

Condition breaches happen at 6:05 am and 10:45 pm.

Keep an automatic 28-day condition record from one camera-free box when council offices are shut.

No mains electricity, no Wi-Fi and no app to install. Choose sound levels, brightness or gate movements. Download the dated PDF for your next inspection.

Pre-configured dispatch within 10 working days of an accepted order or council PO.

Download a council or CEMP quote

Field drawings of a boundary post, gate contact and a light probe on the inside of a window.
Fitting positions · Use a permitted, safely accessible point.
One fitted condition probe / Four numbered witness tiles / Daily records in UTC
Choose the fitting

Three ways to record a condition

Each box has one probe fitted for the job. A sealed battery powers the box. It sends numbers over a mobile signal. No mains electricity, Wi-Fi or app is needed.

Mode 1

Construction hours and night plant

Five-minute average sound levels in dBA and the highest recorded level within each interval. Compare the figures with the working hours written into the permission.

Record numbers only. A loud reading cannot identify the source. Regional wind and rain estimates give context where available.

Mode 2

Floodlights and lighting curfews

Take a brightness reading in lux every five minutes at a fixed window or authorised boundary point. Compare evening readings with the permitted switch-off time.

A light-sensitive probe has no camera lens. Twilight, sunrise, sunset and moon position provide context when site coordinates are supplied.

Mode 3

Gate openings and closing times

A contact on the gate records when it opens and closes. Compare daily opening counts and times against the condition on file.

One opening may serve several vehicles. A gate event cannot identify a vehicle, a number plate or the number of HGVs.

Field drawing to a common scale with nominal 110 by 85 mm enclosure, fitted lead, four 50 mm tiles and A5 card.
Box contents · Nominal enclosure and fitting dimensions.
What comes in the box

From site post to planning file

One weatherproof box with a fitted probe, four 50 mm numbered witness tiles and an A5 laminated quick-start and case-reset card.

Tap a compatible smartphone against a tile like a contactless card payment, or scan its printed square with the phone camera. Add a permitted site photo alongside the readings.

Download a dated PDF whenever you need it. Give the officer a read-only link and withdraw it when the case closes.

Who uses the record?

Planning enforcement teams

See which hours merit a witnessed visit. Archive the case before moving a fleet box to its next site.

Site operators and consultants

Put the permitted hours, your dated readings and site-notice photos together for a condition discharge or construction management plan.

Residents and associations

Keep a 28-day diary from your own property. Save the original times and share only the relevant case.

Prices and packs
Single-site pricing

Buy a box for one condition

Planning your purchase? Download a pricing sheet now. We are confirming fitted units, payment and destination VAT before accepting payment.

Buy outright

Single-site box

€449

Per box · service included

Own the unit and the tiles. After the first year you can renew mobile service and the private PDF vault by invoice for €149 per box per year. No automatic debit.

Pre-Configured Dispatch within 10 Working Days: Every box and numbered site tile set is individually registered to your vault and pre-activated at our bench before dispatch so it works the moment it is fixed in place.

One capital invoice

10-year condition box

€1,195

Per box · service included

Ten years from activation or 500 MB of box transmissions per unit, whichever comes first. No annual fees. Budget for a replacement battery at trade price, typically after 3–5 years.

Pre-Configured Dispatch within 10 Working Days: Every box and numbered site tile set is individually registered to your vault and pre-activated at our bench before dispatch so it works the moment it is fixed in place.

Council procurement

Evaluate two boxes or equip a county team

Fixed evaluation · two boxes

30-day two-box pilot

€795

Excluding VAT

30 days from activation, with no rolling renewal. Return the evaluation equipment. The full pilot fee is credited once against a five-box fleet ordered within 60 days of pilot activation.

Pre-Configured Dispatch within 10 Working Days: Every box and numbered site tile set is individually registered to your vault and pre-activated at our bench before dispatch so it works the moment it is fixed in place.

Multi-case pass · five boxes

Five-box county fleet

€4,750

Excluding VAT

Five boxes, twenty tiles and carry-case labels. The standard mix is two sound, two light and one gate. Choose a different mix on your quote. Reuse the equipment across unlimited cases within the ten-year or 500 MB per-box allowance.

Pre-Configured Dispatch within 10 Working Days: Every box and numbered site tile set is individually registered to your vault and pre-activated at our bench before dispatch so it works the moment it is fixed in place.

For your purchasing file. Check your authority’s card limit, VAT treatment, standing orders and the value of related purchases. A pack price alone does not establish permission for a direct award. Net-30 terms start on acceptance of a verified PO.

Pre-Configured Dispatch within 10 Working Days: Every box and numbered site tile set is individually registered to your vault and pre-activated at our bench before dispatch so it works the moment it is fixed in place.

Before fixing a unit

What the record can tell you

What the box does

Time-stamps numeric readings and gate contacts. Optional tile photos are added deliberately by a person with permission. No automatic images or audio clips are part of the case record.

Flag an unusual time, save the PDF and decide whether to visit.

What needs an officer or specialist

A number cannot establish who caused it or whether a condition was breached. This is not a Class 1 acoustic measurement, a BS 4142 assessment or a lighting engineer’s survey. The authority determines its next step.

Obtain permission. Never monitor a private dwelling covertly or upload identifiable people, plates or private interiors. Read the field privacy rules.